| Projects |
| Bayport Terminal Complex – Bayport Container Terminal Phase I, Phase 1A Wharf Extension, and Review of Freeze Wall Construction on Existing Drilled Shafts – Bayport Terminal Complex Ph. 1A |
| Galveston Causeway Bridge CSJ: 0500-01-117 |
| Pelican Island and San Jacinto Placement Areas – Land Boring, Task Order #4; URS Corporation |
| Core drilling, soil sampling & laboratory testing FY 1991; Galveston, Texas |
| Gulf Intracoastal Waterway; Aransas National Wildlife Refuge, TX |
| US 82 between Greenville, Mississippi and Lake Village, Arkansas |
| Construction of Barge Lanes along Houston-Galveston Navigation Channel |
| Marine borings, Boston Harbor proposed outfall diffusers & tunnel alig; Boston, Massachusetts |
| Core drilling, soil sampling & laboratory testing of soil; Galveston, Texas |
| Proposed Slope stability Analysis of the Proposed Configuration by Zachary for the Port of Houston Authority |
| Core drilling, soil sampling & laboratory testing; 3 year open-end con; Galveston District, Texas |
| Core drilling, sampling and laboratory testing 5 Year Contract; Galveston District, Texas |